Codigo Descrição do Serviço Valor (R$)
9 SUBST/MUDANCA RAMAL AGUA 373,56
10 TRANS/RAMAL ESGOTO 738,23
12 AFERICAO DO HIDROMETRO 254,39
15 RELIGACAO A PEDIDO 71,40
16 SEGUNDA VIA DE CONTA 0,50
21 ANALISE FISICO-QUIMICA 167,04
22 ANALISE BACTERIOLOGICA 158,28
27 RELIGACAO IND COMERCIAL 71,40
34 RESTABELECE LIG SUPRIMIDO 496,04
57 SANCAO RELIG RESIDENCIAL 352,64
58 SANCAO BOMBA LIGADA REDE 352,64
59 RELIGACAO PUBLICA 71,40
84 SANCAO RELIG COMERCIAL 694,98
85 SANCAO RELIG INDUSTRIAL 840,21
193 LIGACAO MED INDIVIDUAL C/ INST HID 111,93
200 LIG AGUA S/HID 20 MM RES 376,93
201 LIG AGUA S/HID 25 MM RES 408,18
202 LIG AGUA S/HID 32MM RES 527,44
203 LIG AGUA S/HID 50 MM RES 623,09
205 LIG AGUA C/HID 20 MM RES 496,04
206 LIG AGUA C/HID 25 MM RES 586,08
207 LIG AGUA C/HID 32MM RES 1.012,03
208 LIG AGUA C/HID 50 MM RES 1.499,75
210 LIG AGUA S/HID 20 MM CIP 376,93
211 LIG AGUA S/HID 25 MM CIP 408,18
212 LIG AGUA S/HID 32 MM CIP 527,44
213 LIG AGUA S/HID 50 MM CIP 623,09
214 LIG AGUA C/HID 20 CIP 496,04
215 LIG AGUA C/HID 25 MM CIP 586,08
216 LIG AGUA C/HID 32 MM CIP 1.012,03
217 LIG AGUA C/HID 50 MM CIP 1.499,75
218 LIG AGUA C/HID COND RES 111,93
220 LIG AGUA C/HID COND CIP 111,93
221 LIG AGUA EXT CHID 20 RES 496,04
222 LIG AGUA EXT CHID 20 CIP 496,04
225 LIGACAO DE ESGOTO 738,23
238 DECLARACOES DIVERSAS 80,72
239 EXTRATO DE DEBITO 80,72
270 VALOR DO HID 1,5 M3 165,40
271 VALOR DO HID 3 M3 169,87
272 VALOR DO HID 5 M3 228,24
273 VALOR DO HID 7 M3 530,84
274 VALOR DO HID 10 M3 682,00
275 VALOR DO HID 20 M3 823,74
285 AFERIC HID OFIC INF 20 M3 254,39
286 AFERIC HID OFIC SUP 20 M3 903,64
287 AFERICAO DE HID IN LOCO 254,39
292 RELOCA HID C/TAMPA CONCRE 121,29
293 RELOCA HID C/CX FIBRA VID 183,61
294 RELOCA HID CX ARTICULADA 120,63
301 SUBST PROT C/TAMPA CONCRE 173,31
302 SUBST PROT X/CX FIBRA VID 173,31
303 SUBST PROT C/CX ARTICUL 173,31
304 SUBST CX OU TAMPA CONCRET 32,77
312 DESLIG A PEDIDO RES 20 MM 70,08
313 DESLIG A PEDIDO RES 25 MM 70,08
314 DESLIG A PEDIDO RES 32 MM 70,08
315 DESLIG A PEDIDO RES 50 MM 70,08
316 DESLIG A PEDIDO CIP 20 MM 70,08
317 DESLIG A PEDIDO CIP 25 MM 70,08
318 DESLIG A PEDIDO CIP 32 MM 70,08
319 DESLIG A PEDIDO CIP 50 MM 70,08
320 DESLIG A PEDIDO RESIDENC 70,08
321 DESLIG A PEDIDO CIP 70,08
322 RELIGACAO C/INST HID RES 71,40
323 RELIGACAO C/INST HID CIP 71,40
324 RELIGACAO C/SUBS HID RES 71,40
325 RELIGAGAO C/SUBS HID CIP 71,40
326 RESTAB LIG SUP PARC RES 71,40
327 RESTAB LIG SUP PARC CIP 71,40
328 RESTAB LIG SUP TOT RES 496,04
329 RESTAB LIG SUP TOT CIP 496,04
330 REST SUP PARC INS HID RES 71,40
331 REST SUP PARC SUB HID CIP 71,40
332 REST SUP TOT INS HID RES 496,04
333 REST SUP TOT SUB HID CIP 496,04
334 REST SUP PARC INS HID CIP 71,40
335 REST SUP PARC SUB HID RES 71,40
336 REST SUP TOT INS HID CIP 496,04
337 REST SUP TOT SUB HID RES 496,04
372 DESLOCAMENTO RAMAL DE AGUA 373,56
373 SUBST DE RAMAL AGUA 373,56
375 TRANSP DE RAMAL AGUA 373,56
379 SUBST DE REGISTRO 20 MM 37,47
380 SUBST DE REGISTRO 25 MM 40,50
381 SUBST DE REGSITRO 32 MM 77,85
382 AUMENTO DIAMETRO P 25 MM 373,56
383 AUMENTO DIAMETRO P 32 MM 373,56
384 AUMENTO DIAMETRO P 50 MM 373,56
409 ANAL FISICO-QUIMICA TERC 1.104,38
410 COL AGUA ANAL BACTERIOLOG 158,28
422 DESLOC DE RAMAL ESGOTO 738,23
423 SUBST DE RAMAL ESGOTO 738,23
424 TRANSP DE RAMAL ESGOTO 738,23
427 INST VALV RETENCAO ESGOTO 374,81
429 RAMAL ADICIONAL ESGOTO 738,23
452 REP DE CALCAMENTO LIG 64,13
453 REPOSIC ASFALTICA LIG 104,44
467 RELOCA HID C/CX POLICARBO 210,48
468 SUBST TAMPA F F GRANDE 285,79
469 INST PROT TAMPA FF GRANDE 371,52
470 INST CX PLAST PAREDE 48,63
471 SUBST CX PLAST PAREDE 48,63
472 INST CX PLAST PISO PEQUEN 84,24
473 INST CX PLAST PISO GRANDE 146,63
529 RELIG C/INST HID1,5M3 RES 71,40
530 RELIG C/INST HID3,0M3 RES 71,40
531 RELIG C/INST HID5,0M3 RES 71,40
532 RELIG C/INST HID7,0M3 RES 71,40
533 RELI C/INST HID10M3 RES 71,40
534 RELIG C/INST HID20M3 RES 71,40
535 RELIG C/INST HID30M3 RES 71,40
536 RELIG C/INST HID1,5M3 CIP 71,40
537 RELIG C/INST HID3,0M3 CIP 71,40
538 RELIG C/INST HID5,0M3 CIP 71,40
539 RELIG C/INST HID7,0M3 CIP 71,40
540 RELIG C/INST HID10M3 CIP 71,40
541 RELIG C/INST HID20M3 CIP 71,40
542 RELIG C/INST HID30M3 CIP 71,40
543 RELIG C/SUBS HID1,5M3 RES 71,40
544 RELIG C/SUBS HID3,0M3 RES 71,40
545 RELIG C/SUBS HID5,0M3 RES 71,40
546 RELIG C/SUBS HID7,0M3 RES 71,40
547 RELIG C/SUBS HID10M3 RES 71,40
548 RELI C/SUBS HID20M3 RES 71,40
549 REL SUBS HID MAIOR 30 RES 71,40
550 RELIG C/SUBS HID1,5M3 CIP 71,40
551 RELIG C/SUBS HID3,0M3 CIP 71,40
552 RELIG C/SUBS HID5,0M3 CIP 71,40
553 RELIG C/SUBS HID7,0M3 CIP 71,40
554 RELIG C/SUBS HID10M3 CIP 71,40
555 RELIG SUBS HID20M3 CIP 71,40
556 REL SUBS HID MAIOR 30 CIP 71,40
557 REST SUPTOT INSH1,5M3 RES 496,04
558 REST SUPTOT INSH3,0M3 RES 496,04
559 REST SUPTOT INSH5,0M3 RES 586,08
560 REST SUPTOT INSH7,0M3 RES 1.012,03
561 REST SUPTOT INSH10M3 RES 1.012,03
562 REST SUPTOT INSH20M3 RES 1.499,75
563 REST SUPTOT INSH MAIOR 30M3 RES 1.499,75
564 REST SUPTOT SUBH1,5M3 CIP 496,04
565 REST SUPTOT SUBH3,0M3 CIP 496,04
566 REST SUPTOT SUBH5,0M3 CIP 586,08
567 REST SUPTOT SUBH7,0M3 CIP 1.012,03
568 REST SUPTOT SUBH10M3 CIP 1.012,03
569 REST SUPTOT SUBH20M3 CIP 1.499,75
570 REST SUPTOT SUBH MAIOR 30M3 CIP 1.499,75
571 REST SUPTOT INSH1,5M3 CIP 496,04
572 REST SUPTOT INSH3,0M3 CIP 496,04
573 REST SUPTOT INSH5,0M3 CIP 586,08
574 REST SUPTOT INSH7,0M3 CIP 1.012,03
575 REST SUPTOT INSH10M3 CIP 1.012,03
576 RES SUPTOT INSH20M3 CIP 1.499,75
577 RES SUPTOT INSH MAIOR 30M3 CIP 1.499,75
578 RES SUPTOT SUBSH1,5M3 RES 496,04
579 RES SUPTOT SUBH3,0M3 RES 496,04
580 RES SUPTOT SUBH5,0M3 RES 586,08
581 RES SUPTOT SUBH7,0M3 RES 1.012,03
582 RES SUPTOT SUBH10M3 RES 1.012,03
583 RES SUPTOT SUBH20M3 RES 1.499,75
584 RES SUPTOT SUBH MAIOR 30M3 RES 1.499,75
587 SUSBT HID5,0M3 P/AFERI O 254,39
588 SUSBT HID7,0M3 P/AFERI O 254,39
589 SUSBT HID10M3 P/AFERI O 254,39
590 SUSBT HID20M3 P/AFERI O 254,39
591 SUSBT HID MAIOR 30M3 P/AFERIR 903,64
592 REST SUPTOT DI M20MM CIP 496,04
593 REST SUPTOT DI M25MM CIP 586,08
594 REST SUPTOT DI M32MM CIP 1.012,03
595 REST SUPTOT DI M50MM CIP 1.499,75
605 RELOC HID 3M3TCONCRETO 120,98
616 VIAB. TECNICA AGUA 431,71
617 VIAB. TECNICA ESGOTO 431,71
618 ANALISE DE PROJETO AGUA 959,41
619 ANALISE DE PROJETO ESGOTO 959,41
713 VIABILIDADE TECNICA DE AGUA E ESGOTO 863,43